Manual / Planned disruptions
The status bar
- For
- a controller moving a planned disruption on, and anyone reading where one stands
- Status
- current
- Covers
- the status bar at the top of a planned disruption's page — its segments, In force and Completed, Cancel or withdraw ▾, and the confirmation that opens below the bar
- Last checked against the app
e6fb893(2026-11-23) — re-read against the code on 2026-11-23, not against a running app; the passages on closure types written from the code at58f52358plus the closure-types changes to the record page (2026-11-19), and not yet read against a running app
Every planned disruption in Kinetic Melbourne OCC — the tool built for Kinetic Melbourne's Operational Control Centre — has a status: a short statement of how far the job has got, which your colleagues read in the register. The status bar shows it and changes it. It sits in the bar across the top of the record's page, so it is on screen whichever stage you are on.
What you are looking at
Three segments, in the order a record travels:
Assessing · Diversions planned · Notice issued
then, after a dotted divider, In force and Completed with the words set by the dates beside them, and Cancel or withdraw ▾ at the right end.
- The current status is filled in.
- ✓ marks a status the record has been through;
- ◌ marks one it skipped;
- a segment you can move to is a button. One marked ↩ is a move back;
- a segment you cannot move to looks muted. Pressing it prints the reason in a short note at the right, just below the bar — "A disruption does not go back to Diversions planned." on a record whose notice is issued. It goes when you press its ×, press Escape, or click anywhere else.
On a narrow window the bar folds into one button — Status: Diversions planned ▾ — that opens the same segments as a list over the page. Choosing one closes the list; Escape closes it too.
Changing the status
Press the segment you want. A confirmation opens in a panel just below the bar, over the page, so the bar itself stays the same size: Move to Diversions planned?, one sentence saying what that status records, and Note for the history (optional) — with an example such as TMC asked to move the dates where one fits. Move to Diversions planned makes the move; Cancel leaves it alone. The note goes on the record's history beside the move. If you have typed a note and then press another status button, the confirmation you were typing in stays, with your words in it — finish or cancel it first.
Moving to Diversions planned asks first when every period is already over. Nothing ends a record's detours while it is at Assessing, but from Diversions planned on, the app ends them a day after the last period. So if every period has already finished and the record has detours in use, the move asks before it is made, naming them and saying when they would end — within a minute of the move, if the last period finished more than a day ago:
Every period of PD-2026-0012 is in the past, and it has 1 detour in use: DIV-2026-0031. Moving PD-2026-0012 to Diversions planned starts the clock that ends detours, so it will end within a minute of the move, because the last period finished more than a day ago.
OK makes the move as asked; Cancel leaves the record where it is, so you can put the dates right first on ① Describe. The same question is asked when you press Set it now in ④ Notify & issue, and when you drag a card onto Diversions planned on the register's Board.
The Next: line on ③ Plan diversions offers a status too — Next: mark the diversions planned Mark diversions planned… — and it opens this same confirmation. It is the only status a Next: line ever offers: a record starts at Assessing, and going back is a choice you make on the bar. The … on the button is the sign that a question follows. Nothing moves the status until you press the confirmation's own button.
Every status, in plain words
| Status | What it says | Its confirmation reads |
|---|---|---|
| Assessing | Working out who is affected and settling the dates with the TMC | — (where every record starts) |
| Diversions planned | Every closure has a diversion planned, ready for a notice | Records that every closure has a diversion planned. From here the dates decide when it is in force. |
| Confirmed | The same step, on a disruption with no road closure: the dates and details are confirmed | Records that the dates and details are confirmed. Buses are not diverted. From here the dates decide when it is in force. |
| Notice issued | The notice has gone out to the depots | — (only issuing sets it; see below) |
| Cancelled | Called off. Kept on the register — nothing here is ever deleted | Closes this disruption as called off and ends its detours. Closed disruptions cannot be edited again. |
| Withdrawn | The TMC withdrew it. Kept on the register | Closes this disruption as withdrawn by the TMC and ends its detours. Closed disruptions cannot be edited again. |
Going back is ordinary. A TMC reopening dates it had already agreed is part of the job, so Diversions planned can go back to Assessing (marked ↩): "Reopens the dates or the extent with the TMC. The diversions drawn are kept, and the dates stop deciding when it is in force." Nothing you have planned is thrown away, and the detours are there to check again when the dates settle. Once the notice is issued, a record does not go back.
Received, Negotiating and Dates confirmed are gone. Until October 2026 the bar had six segments. A record that was at any of those three now shows Assessing. Its history still says what happened at the time — Status: Negotiating → Dates confirmed — because that is what was recorded then. A saved link that filtered the register by one of them opens the register showing every status.
A disruption that does not divert buses
When a record has no Road closure — every closure is a Stop closure or a Lane closure (buses allowed) (see ① Describe) — there are no diversions to plan, so the middle segment would be untrue. On such a record:
- the middle segment reads Confirmed. It is the same step as Diversions planned on any other record, under the word that is true of this one;
- pressing Confirmed — or Next: confirm the dates and details Confirm… on ② Who's affected — opens Confirm the dates and details?, with the sentence Records that the dates and details are confirmed. Buses are not diverted. From here the dates decide when it is in force. Confirm makes the move;
- In force and Completed follow the dates from Confirmed onwards, exactly as they do from Diversions planned.
What comes after Confirmed depends on the closures:
- with a Stop closure, the record has a notice to issue: Notice issued is reached by issuing it on ④ Notify & issue, as on any record. Its steps are Assessing, Confirmed, Notice issued, In force;
- with lane closures only, nothing goes on a notice. Notice issued is muted, and pressing it says Only lane closures — buses still get through, so there is no notice to issue. Its steps are Assessing, Confirmed, In force.
The register's status column says Confirmed for such a record too, and its Next: line reads confirm the dates and details — then issue the notice for a record of stop closures, and nothing for one of lane closures only. Under every record's status the column also says what kind of closure the disruption's most serious one is — Stop closure, Lane closure or Road closure — beside a small mark in the map's colour for it. A disruption with no closure yet is marked Road closure, as it is on the map, until its closures say otherwise. The words are never coloured; the mark is.
Nothing about the record is stored differently. Confirmed and Diversions planned are one status with two names. If a Confirmed record gains a Road closure — one added, or a lane closure changed to one — it goes back to Assessing in the same save, because no diversion has been planned for it yet — unless one of its detours is already in use.
The record's History uses the same two names. On a record with no road closure, a move reads Status: Assessing → Confirmed. The History goes by the record's closures now, so on a record whose closures have changed type, a line written before the change can name the step by its other name. The line written when a Confirmed record goes back reads Status: Confirmed → Assessing — it needs a diversion now…, whatever the record says today.
The other way, the status does not move. A record left with no road closure keeps the status it has. At Notice issued it stays Notice issued, and its notice is marked out of date instead — see Changing a type.
In force and Completed come from the dates
In force and Completed are never buttons. They light up by themselves:
- In force — on now, going by its dates: one of the record's periods is running at this moment;
- Completed — every period has ended.
The words beside them, set by the dates, say what they depend on, and pointing at either says the rest. They only apply from Diversions planned onwards. While a record is Assessing, its dates may still be a proposal, and a proposal whose date has passed is not a completed disruption; it is one that was never planned. So a record left at Assessing through its own period still reads Assessing, not In force, and is not drawn among the closures in force on the map — mark its diversions planned when they are.
In the register, a record that is in force shows In force in its status column, and pointing at it says which status a controller last set.
Notice issued comes only from issuing
Notice issued is never a move you make on the status bar. Pressing it takes you to the Issue part of ④ Notify & issue: "Opens the notice. Only issuing the notice sets this status." Issuing a version is what moves the record there, in the same step that keeps the copy that went out — so a record that says Notice issued always has one. See ④ Notify & issue.
Cancelling and withdrawing
Cancel or withdraw ▾, at the right end of the bar, holds the two ways a record ends early:
- Cancel this disruption… — the job is called off;
- Withdrawn by the TMC… — the TMC has withdrawn it.
Both ask for a reason, and will not go ahead without one: "Give a reason. Once it is closed, the history is the only place it is kept." Keep it open backs out.
Closing a disruption ends its detours in the same step. Before you confirm, the confirmation lists them by reference — Cancelling also ends its 2 detours: DIV-2026-0031, DIV-2026-0032. They do not come back. — and when you confirm, the record closes and those detours end together. A short message then names the ones that ended. They are ended in your name, and unlike a detour the dates ended, they do not come back if anything changes later.
Two kinds of detour are treated differently, and the list says so:
- A detour in force. One that somebody put into force by hand on the Diversions tab stops the cancel: "DIV-2026-0033 is in force — put into force on the Diversions tab. Stand it down on its record there first; until then this disruption cannot be closed." The button stays greyed out until it has been stood down.
- A detour shared with another disruption. A single detour planned for the time two disruptions overlap stays in use while the other one is still on — DIV-2026-0034 is kept, because PD-2026-0013 still needs it. It then ends a day after that other disruption's last period, as its own detours do.
A closed record cannot be edited again. Its status bar reads Cancelled — read only. Closed disruptions cannot be edited again., and its page can be read but not changed. It stays on the register for good, under Closed in the register's status bar.
Why a stage and a status are two different things
A stage is where you are working. A status is what you are telling everyone else. You might open ② Who's affected a dozen times while a record sits at Assessing, and go back to ① Describe to fix a closure on a record that is Diversions planned. The stage you are on is never recorded; a status is an audited statement, with your name and the time, that a colleague reads in the register.
So finishing a stage offers the status that follows and never sets it, and changing a status never moves you to another stage.
What it does not mean
In force is not a report from the road. It is the agreed dates and the clock. If the TMC starts late or finishes early, the record will not know.
A status is what somebody asserted. Diversions planned means a controller said so; the stage strip's ✓ on ③ Plan diversions is the app's own reading of the groups. The two can disagree, and when they do, it is worth finding out why.
When it looks wrong
The segment you want is muted. Press it anyway: the reason is printed under the bar, with the moves that are allowed from here.
There are no buttons at all. You are reading as a Viewer — the bar says Changing the status needs the Editor role. — or the record is closed.
Cancel the disruption is greyed out. One of its detours is in force. Open it on the Diversions tab, stand it down, and come back.
Its detours could not be listed just now. The confirmation says so rather than claiming there are none. Confirming still ends every detour in use, and is still refused if one is in force.
A cancelled disruption still has a detour in force. It was cancelled before cancelling ended its detours (November 2026), and somebody had put that detour into force by hand. The app leaves a detour drivers are following alone until the disruption's own dates have passed and a day more, and then ends it. If the disruption has no dates, or its last period has no end, there is nothing to wait for, and the detour ends within a minute. To end it sooner, stand it down on its record on the Diversions tab. Any of that disruption's other detours end by themselves within a minute.
You typed a note and moved to another stage. You are asked first: "Discard a note on a status change?"